skip to Main Content

BARRACUDA’S WORK SITES – UAE

Barracuda Diving & Marine Service in United Arab Emirates, providing marine works:

QUAY WALL – Dubai Harbour Marina
QUAY WALL – AlGarhoud Marina
QUAY WALL – Port Rashid
QUAY WALL – AlHamriya Port
BREAKWATER – Jebel Ali Port
REVETMENT DEVELOPMENT – Port De Lamer
QUAY WALL – AlFiyah Island
NEW JETTY CONSTRUCTION – Saqr Port
DIVING SUPPORT – The Pointe Water Fountain
FENDER INSTALLATION – Dubai Creek Bridge
REVETMENT DEVELOPMENT – Port De Lamer

INSTALLATIONS
Pontoon Installation
Installation of Dry Mix Jumbo Bags – World Island
Installation of Plugs in Inlet/Outlet Piping
Navigations Equipment – Dubai Harbour Marina

SALVAGE WORKS
Boats Salvage Works – Dubai
Crane Salvage Works – Dubai Harbour Marina

INSPECTIONS
Inspection and Repair – Barge AZ Chengdu
Inspection and Debris Removal, Broken Concrete Pieces – Yas Arena, Abu Dhabi
Underwater Inspection of Sheet Piles – Hutchison Ajman International Terminal


QUAY WALL – Dubai Harbour Marina
Works included Block Placing, Screeding, Rock Levelling & Geotextile Laying. Shell and Sinker Block Placing and Installation of Mooring Buoys. Number of Blocks 14,250, over 2,100 meters.

Dubai Harbour Marina – Barracuda’s Works Include Quay Wall Development

Contractor: AST-OVERSEAS & VAN OORD MIDDLE EAST LIMITED
Duration: Apr 2018-Dec 2021
Location: Dubai Harbour Master Plan


QUAY WALL – AlGarhoud Marina
Works included Manual Screeding, Geotextile and Block Placing, in addition to Fender Installation. Number of Blocks 4,500, over 1,100 meters.

Al Garhoud Marina – Barracuda’s Works Included Installation of Blocks and Fenders

Contractor: CH2M Hill Company DUTCO BALFOUR BEATTY LLC
Duration: Dec 2016–Feb 2017
Location: Al Garhoud Maintenance Facility Package 1 (Marine Works)


QUAY WALL – Port Rashid
Works included Block Placing Screeding and Geotextile. Number of Blocks 750, over 160 meters.

Port Rashid – Barracuda’s Works Included Quay Wall Installation

Contractor: DUBAI SHIPBUILDING & ENGINEERING LLC
Duration: 2017
Location: Dubai Maritime City, Port Rashid


QUAY WALL – AlHamriya Port
Works included Placing of Blocks, Screeding & Geotextile Laying. Number of Blocks 3,900, over 800 meters.

AlHamriyah Port – Barracuda’s Works Included Quay Wall Development

Contractor: BAM INTERNATIONAL
Duration: Nov 2015-Feb 2016
Location: AlHamriyah Port


BREAKWATER – Jebel Ali Port
Works included Placing of Stabits. Number of Stabits 10,000, over 2,200 meters.

Jebel Ali Port – Barracuda’s Works Included Placing of Stabits

Contractor: BAM INTERNATIONAL
Duration: Jan-Mar 2016
Location: Jebel Ali Port


REVETMENT DEVELOPMENT – Port De Lamer
Works included Quay Wall Construction, Geotextile Laying, Screeding, Air Lifting, Block Placing, anti-scour and Inspection. Number of Blocks 2,000, over 250 meters.

Port De Lamer – Barracuda’s Works Included Revetment Development

Contractor: PLC CONTRACTING LLC
Duration: Jan-Jul 2018
Location: Port De Lamer, Jumeirah Open Beach, Dubai


QUAY WALL – AlFiyah Island
Works included Screeding, Geotextile, Slipway, Rock Revetment & Blocks Installation works. Number of Blocks 220, over 170 meters.

AlFiyah Island – Barracuda’s Works Included Screeding, Geotextile and Block Placing for Quay Wall Development

Contractor: POLARIS GROUP
Duration: Nov 20 – Mar 21
Location: AlFiyah Island, Abu Dhabi


NEW JETTY CONSTRUCTION – Saqr Port
Works included Quay Wall Construction, Geotextile Laying, Screeding, Air Lifting, Block Placing, Anti-Scour and Inspection. Number of Blocks 11,000, over 1,500 meters.

Saqr Port Extension – Barracuda’s Works Included Quay Wall Construction

Contractor: BAM INTERNATIONAL
Duration: Jul 2017-Dec 2018
Location: Mina Saqr Extension Project in Ras Al Khaimah


DIVING SUPPORT – The Pointe Water Fountain
The Pointe Water Fountains was confirmed in Oct 2020 as the largest fountain in the world.
Works included Diving Support including Underwater Connections of Hoses, Cables, Cylinders and Rigging.

On Palm Jumeirah, largest fountain in the world

Contractor: CHINA HARBOUR ENGINEERING CO. Ltd
Duration: Nov 2019 to Feb 2020
Location: The Pointe Water Fountains, at Palm Jumeirah


FENDER INSTALLATION – Dubai Creek Bridge
Works included installation of Fenders.

Dubai Creek Bridge – Barracuda’s Works Included Installing Fenders

Contractor: SIX CONSTRUCT CO. LLC.
Duration: Dec 2016
Location: Dubai Creek Bridge, Jumeirah, Dubai


REVETMENT DEVELOPMENT – Port De Lamer
Works on a 4 km Breakwater, the Contractor executed Dredging, Reclamation & Shore Protection Works, which Barracuda supported with underwater works, inspections and shoreline activities.

Port De Lamer – Barracuda’s Works Included Revetment Development

Contractor: PROJECTS LINK
Duration: Sep 2015-Oct 2016
Location: Port De Lamer, Jumeirah Open Beach (a MERAAS Development Project)


INSTALLATIONS

Pontoon Installation
Works included removal of Existing Pontoon and Re-Installation Works and Installation of Seahorse Rope.

Installations

Contractor: MAJESTIC MARINE
Duration: Dec 2020-Feb 2021
Location: Dubai


Installation of Dry Mix Jumbo Bags – World Island
Works included Screeding & Geotextile works and Installation Stacking of Dry Mix Jumbo Bags.

World Island, South America – Barracuda’s Works Included Dry Mix Breakwater Construction

Contractor: DUBAI DRYDOCKS (DP World)
Duration: Dec 20
Location: South America, World Island, Dubai waters


Installation of Plugs in Inlet/Outlet Piping
Works included Installation & Removal of Plugs on Intake Line in Water Sump for Replacement of Fire Pump.

Contractor: ROTARY ENGINEERING
Duration: Nov 2020
Location: ENOC-ENGG Oil Refinery, Jebel Ali


Navigations Equipment – Dubai Harbour Marina
Works included Diving Services for ADCP Installation and Maintenance.

Dubai Harbour Marina – Barracuda’s Works Included ADCP Installation & Maintenance

Contractor: VAN OORD Marine Ingenuity
Duration: Sep 18 to Oct 19
Location: Dubai Harbour Marina


SALVAGE WORKS

Boats Salvage Works – Dubai
Works included diving support for:
– Recovery of Boat at World Island & Port Rashid, Dubai
– Recovery of Sunken Yacht in World Island, Dubai waters
– Recovery of Sunken Yacht in Port Rashid, Dubai

Contractor: MUBARAK MARINE
Duration: Jan 2020-21
Location: in UAE


Crane Salvage Works – Dubai Harbour Marina
Works included inspection dive for assessment of Crane’s position and then underwater cutting and supervision of lifting.

Dubai Harbour Marina – Barracuda’s Works Included Salvage of Crane

Contractor: MAJESTIC MARINE
Duration: 5-7 Nov 2019
Location: Dubai Harbour Marina


INSPECTIONS

Inspection and Repair – Barge AZ Chengdu
Works included Barge AZ Chengdu Hull Inspection & Cracks Repair Works.


Contractor: VAN OORD MIDDLE EAST LIMITED
Duration: Nov 2018
Location: Palm Jumeirah, Dubai


Inspection and Debris Removal, Broken Concrete Pieces – Yas Arena, Abu Dhabi
Diver survey of seabed lead to easy removal of a variety of debris, using a metal basket attached to a crane.

Contractor: BAM HIGGS & HILL LLC:
Duration: Nov 2020
Location: Yas Arena, Abu Dhabi


Underwater Inspection of Sheet Piles – Hutchison Ajman International Terminal
The sheet pile quay wall involved in this scope was approximately 5500 m long with approximate seabed level varies from -5.0 to -8.5 m Admiralty Chart Datum (ACD). Works included a Visual Inspection, recording by video and photography of any defects, Ultrasonic Thickness Gauge (UTG} testing of cleaned steel in the low water zone and at the seabed (approximately 50 mm below existing bed) in areas suspect of accelerated low water corrosion/microbial induced corrosion and seabed survey.

Hutchison Ajman International Terminal – Barracuda’s Works Included Above & Underwater Inspection of Sheet Piles

Contractor: HALCROW INTERNATIONAL PARTNERSHIP
Duration: Feb 2017
Location: Hutchison Ajman International Terminal

BARRACUDA’S WORK SITES – JORDAN
Barracuda Diving & Marine Service is active with major coastal development projects:

JETTY REHABILITATION – Industrial Terminal
COMBI-WALL REPAIRS – Aqaba New Port
PORT DEVELOPMENT – Aqaba New Port
PORT EXTENSION – Aqaba Container Terminal
TERMINAL UPGRADES – Oil Terminal

NEW PORT EXPANSION – Aqaba New Port

DIVING & MARINE SERVICES
Pile Repair and Painting – Aqaba Container Terminal
Surveys – Saraya, Aqaba
Marine Personnel – Aqaba Petroleum Terminal
Marine Services – Aqaba Liquid Natural Gas Terminal
Water Jetting – Aqaba Thermal Power Station
Jack Hammering – Aqaba Container Terminal
Salvage – Industrial Terminal
Survey & Jacketing – Aqaba Container Terminal
Survey – Aqaba Thermal Power Station
Cathodic Protection System – Phosphate Rock Terminal
Inspections – Ayla Oasis

 


JETTY REHABILITATION – Industrial Terminal 

  • – Cathodic Protection System (ICCP) – Steel Clamping System Installation for New Jetty with 31 Anodes and for the Existing Jetty with 39 Anodes
  • – Pile Repairs, for New Jetty with 245 Piles, and for the Existing Jetty with 428 Piles, 28 Fenders & 4 Bollards Removed and Replaced
  • – Dredging – Sulphur Spillage, Removed 6,000 ton
  • – Pile Survey with Thickness Measurements for the Existing Jetty of 428 Piles, three readings per pile.

Contractor: TECNICAS REUNIDAS (UTE TR-PHB Jordan)
Duration: Sep 2015 to 2020
Location: Jordan Industrial Ports PSC’s Industrial Terminal


COMBI-WALL REPAIRS – Aqaba New Port

Works included the repair of combi-wall, underwater welding and concreting, for 5 sheet piles, with around 28 linear meters of weld at depths from 12 to 17 meters.

Aqaba New Port Berth 1 – Combi-Wall Repairs

Contractor: BAM INTERNATIONAL
Duration: Jul-Sep 2019
Location: Aqaba New Port Berth 1

Works included the repair of combi-wall, underwater welding and concreting, for 10 sheet piles, with around 30 linear meters of weld at depths from 12 to 17 meters

Aqaba New Port Berth 2 – Combi-Wall Repairs

Contractor: BAM INTERNATIONAL
Duration: Sep 2018-Jan 2019
Location: Aqaba New Port Berth 2


PORT DEVELOPMENT – Aqaba New Port 

Works included:        

  • – Airlifting
  • – Anode Installation
  • – Dredging Works Underwater
  • – Laying of the Intake Pipeline and removal of the old pipeline
  • – Mason Works Underwater
  • – Placing X-blocks
  • – Silt Curtain Works
  • – Slipway Underwater Installation
  • – Underwater Inspections
  • – Underwater Welding Piles and Capping Beam Skirts
  • – Water-jet Cleaning Underwater

 

Contractor: BAM INTERNATIONAL
Duration: Sep 2012-Apr 2014
Location: Aqaba New Port Project Phase 1 Marine Works


PORT EXTENSION – Aqaba Container Terminal

Works included:

  • – Anchor Rods Installation Inside Piles
  • – Clearing Debris from the Seabed
  • – Clutch Repair Works
  • – Cutting Piles Underwater 33 mm Thickness
  • – Dredging Works Underwater
  • – Installation and Removal of Silt Curtains
  • – Installation of Tie Rods
  • – Lifting Heavy Objects from the sea
  • – Underwater Inspections and Reporting (including CCTV, Video & Photos)
  • – Welding Piles Underwater

Contractor: BAM INTERNATIONAL
Duration: Dec 2011-early 2013
Location: Aqaba Container Terminal Extension


TERMINAL UPGRADES – Oil Terminal

Works included:

  • – Oil Spill Boom Installation, with a 500 Linear Meter Length of Oil Spill Boom
  • – Logistics for HILTI for the Installation of Catwalk, 30 Linear Meter each Catwalk, total 4 Catwalks
  • – Water Depth Survey & Marker Buoys Installation, in 5 Locations
  • – Cathodic System Installation, 293 Sacrificial Anodes Welded on Steel Piles

 

Oil Terminal Jetty – Installing Cathodic Protection System

Contractor: EGYPTIAN MAINTENANCE SERVICE
Duration: May 2017-Feb 2018
Location: Aqaba Oil Terminal Jetty


NEW PORT EXPANSION – Aqaba New Port

Works included:

  • – Geotextile Laying for Scour Protection, with a total of 6,650 Square Meter
  • – Coral Environmental Survey
  • – Coral Transplantation
  • – Diaphragm Wall, Underwater Inspections & Repair
  • – Supply and Installation of Walling Beam and Installation of Tie Rods for Berths 4, 6 & 8
  • – Works inside the Tubular Piles for Berth 4, Casting Concrete Inside 10 Piles, with 2 Meters Depth
  • – Driving Sheet Piles, with around 100 Linear Meter Length
  • – Coring in Concrete, with different diameters and depths
  • – Remove Boulders and X-blocks, around 60 Linear Meter Length, above and below water
  • – Boat Rental and Eco-Barrier Installation, along with Diving Services

Aqaba New Port Expansion
Aqaba New Port – Installation of Sheet Piles

Contractor: ING. E MANTOVANI
Duration: Dec 2017-Dec 2018
Location: Aqaba New Port Phase 2 Expansion


DIVING & MARINE SERVICES
Pile Repair and Painting – Aqaba Container Terminal
Works included cleaning the piles and painting using Amercoat.
Contractor: BAM INTERNATIONAL
Duration: Apr 2016
Location: Aqaba Container Terminal:


Surveys – Saraya, Aqaba

Intake pipeline installation surveys.

Contractor: SARAYA AQABA
Duration: May 2016
Location: Saraya, Aqaba


Marine Personnel – Aqaba Petroleum Terminal

Works included supply of marine personnel.

Contractor: TARGET Engineering
Duration: 2015
Location: Aqaba Petrol Terminal


Marine Services – Aqaba Liquid Natural Gas Terminal

Works included cutting piles, underwater masonry, geotextile and logistics.

Contractor: BAM INTERNATIONAL
Duration: May 2014-Nov 2015
Location: Aqaba Liquid Natural Gas Project


Water Jetting – Aqaba Thermal Power Station

Works included debris cleaning of intake area gates.

Contractor: CENTRAL ELECTRICITY GENERATING COMPANY
Duration: Aug 2014
Location: Aqaba Thermal Power Station


Jack Hammering – Aqaba Container Terminal

Work included demolishing a concrete pourer to achieve minus 15.5 m

Jack Hammering

Contractor: AQABA CONTAINER TERMINAL (ACT)
Duration: Sep 2013-Mar 2014
Location: ACT


Salvage – Industrial Terminal

Works included recovery of platform.

Contractor: ARAB CENTER FOR ENGINEERING STUDIES (ACES)
Duration: May 2013
Location: Jordan’s Industrial Terminal


Survey & Jacketing – Aqaba Container Terminal

Works included thickness survey, repairs & maintenance:

  • – Cleaning Above and Below Water Levels for Repair Works, using various methods
  • – Wrapped Steel Piles with Denso Tape, Insulating with HDPE Jackets
  • – Wrapped Steel Piles with Steel Jackets and Grouting
  • – Extensive Thickness Measurements for the Bulkhead Wall, along with Investigations
  • – Plates Welded onto Bulkhead Wall
  • – Logistics

Contractor: OCEAN KINETICS
Duration: May 2012-Nov 2013
Location: ACT


Survey – Aqaba Thermal Power Station

Works included survey and inspection of waterways.

 

Contractor: ARAB CENTER FOR ENGINEERING STUDIES (ACES)
Duration: Oct 2012
Location: Jordan’s National Electricity Generating Company


Cathodic Protection System – Phosphate Rock Terminal 

Works included cathodic system installation, clamp fixings and pile preparation.

Phosphate Rock Terminal CPS system installation

Contractor: AFCONS INFRASTRUCTURE Ltd
Duration: May-Sep 2012
Location: Phosphate Rock Terminal


Inspections – Ayla Oasis
Works included inspection and construction of underwater pipelines, looking for joint cracks and damage & surveying and construction of underwater works.

Ayla Project
Intake Pipe Inspection

Contractor:
AYLA CONSULTANCY & PROJECTS MANAGEMENT CO./ATKINS & ARABTECH JARDANEH ENGINEERING & ARCHITECTS
Duration: Sep 2009-May 2013

Location: Ayla Oasis

Back To Top
×Close search
Search