Barracuda provided all the underwater works for BAM International at Aqaba Container Terminal:
Clutch repair work
Welding piles underwater
Installation of Tie Rods
Cutting piles underwater 33 mm thickness
Anchor rods installation inside piles
Underwater inspections and reporting
(including CCTV, Video & photos)
Lifting heavy objects from the sea
Dredging work underwater
Clearing debris from the seabed
Installation and removal of silt curtains