Working as the sole sub-contracted team to do the repair works of the old wharf. ACT contracted a Scottish company, Ocean Kinetics, who then assigned the works to us and we have participated with, and for them, since the beginning for:
- Cleaning an area of the old steel piles & bulkhead wall to take thickness meter measurements, as part of the preliminary works
- Cleaning the above and below water levels for repair works, using various methods
- Wrapped steel piles with Denso Tape, insulating with HDPE jackets
- Wrapped steel piles with Steel Jackets and grouting
- Detailed, extensive thickness measurements for the bulkhead wall, along with investigations
- Plates welded onto bulkhead wall
- Logistics – including all permissions and security, shipment handling, customs clearing, storage and delivery; cabin hire, equipment rental and local transportation
- Providing divers and laborers, boats, tools and equipment
|