skip to Main Content
Intake Chamber at Aqaba New Port

Laying final piece of 250 m length pipe line that was laid with 30 degree bend at Aqaba New Port, connected to chamber

Downloads: full (2536x1836) | large (980x709) | medium (300x300) | thumbnail (150x150)
Back To Top
×Close search
Search