skip to Main Content
Barracuda provided all the underwater works for BAM International at Aqaba Container Terminal

Barracuda provided all the underwater works for BAM International at Aqaba Container Terminal:
Clutch repair work
Welding piles underwater
Installation of Tie Rods
Cutting piles underwater 33 mm thickness
Anchor rods installation inside piles
Underwater inspections and reporting
(including CCTV, Video & photos)
Lifting heavy objects from the sea
Dredging work underwater
Clearing debris from the seabed
Installation and removal of silt curtains

Downloads: full (1702x629) | large (980x362) | medium (300x300) | thumbnail (150x150)
Back To Top
×Close search
Search