Works Completed at Ayla Oasis:
- Surveyed two substantial breakwaters on construction with video & photo inspection
- Carried out the construction of the sea water replenishment system
- Involved in concrete construction of two bell-mouth intake structures in the sea bed
- Two hundred & fifty metres out to sea & approximately ten metres deep
- Two metres in diameter laid from bell mouths to shore-line land connection
- Included safety screen, netting installation and pilling
- G.R.P pipes installation
- Supervise and inspect underwater activities (including breakwater & geo-textile installations)
- Underwater surveys (revetment, bedding & levels)
- Breakwater’s construction
- Installation and removal of a temporary jelly-fish netting system